Home
Vehicle Inspection Check In
Labour Hire Docket
SWMS
Job Safety Analysis (JSA)
JSA – Roof Rail
JSA – Scaffolding
Scaff Tags
Handover Certificates
Scaffolding Handover Certificate
Roof Rail Handover Certificate
Reporting page
Safety Meeting/Toolbox Record
Upload Job Photos
Management
Employee Forms
Timesheets
Employee Self Evaluation Form
Application for Leave
Company Policies and Employment Documents
Menu
Home
Vehicle Inspection Check In
Labour Hire Docket
SWMS
Job Safety Analysis (JSA)
JSA – Roof Rail
JSA – Scaffolding
Scaff Tags
Handover Certificates
Scaffolding Handover Certificate
Roof Rail Handover Certificate
Reporting page
Safety Meeting/Toolbox Record
Upload Job Photos
Management
Employee Forms
Timesheets
Employee Self Evaluation Form
Application for Leave
Company Policies and Employment Documents
Scaffold Final Check Off
Client Name:
*
Job Address:
*
Job Owner:
*
---Please Select---
Rick Anderson
Joshua Prior
Scott Willis
Unknown
Checklist (Please Tick):
*
Scaffold is set to the correct distance from the wall for appropriate works to be carried out but not with more than a 220mm from the wall
Toe boards are installed on all decks including end boards
All hand rails are installed
Corners are tied in correctly
All external bracing is installed including Face & End Braces
Lapped boards are correctly wired or lashed down
No loose components are left on any of the working decks
All ties are correctly installed & visually inspected
All excess equipment is neatly stacked/compressed into allocated area
All rubbish is picked up and placed in rubbish bins
Scaff Tag completed and placed on entry point?
Deck height is fit for purpose and allows adequate fall protection?
Screw Jacks have been Centered over Soulboards to ensure correct loading
Are anti-tamper fittings used on this site?
*
- Please select -
Yes
No
N/A
If so, how many fittings?
How many empty stillages remain onsite?
*
Additional Comments:
Onsite Photos
*
Drop files here or
Select files
Max. file size: 64 MB, Max. files: 100.
Scaffolder in charge:
*
Date of Install:
*
DD slash MM slash YYYY
Site Supervisor Sign Off:
*
Date Completed
*
DD slash MM slash YYYY