Home
Vehicle Inspection Check In
Labour Hire Docket
SWMS
Job Safety Analysis (JSA)
JSA – Roof Rail
JSA – Scaffolding
Scaff Tags
Handover Certificates
Scaffolding Handover Certificate
Roof Rail Handover Certificate
Reporting page
Safety Meeting/Toolbox Record
Upload Job Photos
Management
Employee Forms
Timesheets
Employee Self Evaluation Form
Application for Leave
Company Policies and Employment Documents
Home
Vehicle Inspection Check In
Labour Hire Docket
SWMS
Job Safety Analysis (JSA)
JSA – Roof Rail
JSA – Scaffolding
Scaff Tags
Handover Certificates
Scaffolding Handover Certificate
Roof Rail Handover Certificate
Reporting page
Safety Meeting/Toolbox Record
Upload Job Photos
Management
Employee Forms
Timesheets
Employee Self Evaluation Form
Application for Leave
Company Policies and Employment Documents
JSA - Use of Mobile plant
"
*
" indicates required fields
Step
1
of
5
20%
This JSA is completed in conjunction with the Safe Work Method Statement (SWMS) for Erecting, Altering and Dismantling Scaffolding, and Operation of Mobile Plant as well as any other Safe Operating Procedures in place.
Acknowledgement of Risk Matrix
*
I/we have read the Risk Assessment Matrix and understand it's content.
What Mobile Plant are you using?
*
Forklift
Truck Mounted Crane
Has a Pre-start checklist been completed?
Yes
No
What PPE is required for this site and task you are about to complete?
*
Please select all that apply
Gloves
Hard Hat
Foot Protection
Hi-Vis Clothing
Hearing Protection
Safety glasses
Fall Arrest system/Safety Harness
Face Mask
Sun Protection
Client Name:
*
Client Email (if they require a copy of this JSA)
Address
*
Street Address
Date
*
Day
Month
Year
Job Owner
*
Joshua Prior
Scott Willis
Unknown
Have you contacted the site foreman to confirm any site specific safety information?
Yes
No
Not applicable at this site
Are there any hazards or risks specific to this site?
*
What control measures will be put in place to minimise the risk of injury?
*
With these control measures put in place, what is the risk of an injury occurring?
*
Low (Proceed with work and monitor)
Moderate (Proceed with work and monitor)
High (Review and introduce more controls before starting work)
Major (Do not start work, further control measures are needed)
Control measures must be continuously monitored throughout the day to ensure they remain adequate. If an incident or injury occurrs, you must follow incident response procedures first, then control measures MUST be reviewed and amended accordingly to reduce the likelihood of the same or similar injury happening again.
Acknowledgement
*
I agree to abide by the control measures put in place by the Principal Contractor and those within this JSA.
This risk assessment process has been developed in consultation and cooperation with employee/workers and relevant Employer/PCBU. I/we have participated in the above risk assessment and understand its contents. I/we confirm that I/we have the skills and training, including relevant certification to conduct the task as described. I/we agree to comply with safety requirements within this risk assessment including risk control measures, safe work instructions and Personal Protective Equipment described.
Signed and acknowledged by:
Full name
Signature
Actions
Edit
Delete
There are no
Entries.
Add Signature
Maximum number of entries reached.